Complete Guide to PMBOK’s 33 Essential Project Management Documents 2024

The PMBOK (Project Management Body of Knowledge) serves as a comprehensive guide for project management professionals worldwide. Encompassing a range of methodologies, tools, and processes, it stands as an essential reference for those seeking expertise and certification in the field. From risk management to stakeholder engagement, the PMBOK offers insights into every facet of project management

PMBOK’s 33 Project Management Documents

ListList
1. Activity Attributes17. Issue Log
2. Activity List18. Lessons Learned Register
3. Assumption Log19. Milestone List
4. Basis of Estimates20. Physical Resource Assignments
5. Change Log21. Project Calendar
6. Cost Estimates22. Project Communications
7. Cost Baseline (or Budget)23. Project Schedule
8. Duration Estimates24. Project Schedule Network Diagram
9. Project Scope Statement25. Resource Calendar
10. Project Team Assignments26. Resource Requirements
11. Quality Control Measurements27. Risk Register
12. Quality Metrics28. Risk Report
13. Quality Reports29. Schedule Data
14. Requirements Documentation30. Schedule Forecasts
15. Requirements Traceability Matrix31. Stakeholder Register
16. Resource Breakdown Structure32. Team Charter 33. Test and Evaluation Documents

1. Activity Attributes:

Multifaceted characteristics linked to every task in a project. Initially, they might be as simple as a unique identifier or name. As the project unfolds, these attributes expand, making them invaluable for scheduling and tracking.

2. Activity List:

The project’s comprehensive “to-do” list, provides clarity about every task. For dynamic projects, especially agile ones, this list is continually updated.

3. Assumption Log:

A record of all assumptions and constraints underpinning the project. Captures both high-level strategic directions and granular task-based assumptions.

4. Basis of Estimates:

A detailed breakdown of predicted task durations, accounting for various influencing factors like constraints, assumptions, and risks.

5. Change Log:

A meticulous record of every change in the project, ensuring complete transparency for all stakeholders.

6. Cost Estimates:

An exhaustive financial forecast for the project, covering everything from labor to contingencies for unforeseen risks.

7. Cost Baseline:

The project’s financial benchmark. Represents the aggregated estimated costs, keeping stakeholders informed about the monetary aspects.

8. Duration Estimates:

A focused prediction on time, estimating the duration for tasks, phases, or the whole project.

9. Issue Log:

The project manager’s essential tool for noting, tracking, and promptly addressing every arising issue, ensuring smooth project progression.

10. Lessons Learned Register:

An insightful record of the project’s experiences. Captures both triumphs and challenges, benefiting future projects.

11. Milestone List:

Milestones are significant moments or events in a project. The milestone list enumerates all of these, distinguishing between mandatory ones (like those mandated by contracts) and discretionary ones (determined based on historical data). Milestones have a duration of zero, representing crucial points in time.

12. Physical Resource Assignment:

This document registers all the tangible resources to be utilized in the project, such as materials, equipment, supplies, and locations.

13. Project Calendar:

The calendar stipulates the available working days and shifts for scheduled activities. It separates periods available for tasks from those that are not. In some cases, multiple calendars might be required due to different working hours for different tasks. Updates to the project calendar might be necessary as the project progresses.

14. Project Communication Records:

This encompasses various artifacts like performance reports, the status of deliverables, progress, incurred costs, presentations, and other relevant information demanded by stakeholders.

15. Project Schedule:

It’s an output from the scheduling model, detailing interconnected activities with planned dates, durations, milestones, and necessary resources. It includes at the very least the planned start and end date for each activity. Initial plans can be tentative and get finalized once resources are confirmed and planned dates are set. The schedule can be summarized (sometimes referred to as a master schedule or milestone schedule) or detailed. Graphical representations, like Gantt charts, milestone charts, or project schedule network diagrams, are often used.

16. Project Schedule Network Diagram:

A graphical representation of the logical relationships (or dependencies) among the project schedule activities. This diagram can be drafted manually or using project management software. It can encompass all project details or just highlight a few summary activities. The diagram should be accompanied by a brief textual description, elucidating the methodology used for activity sequencing.

17. Project Scope Statement

The Project Scope Statement describes the scope of the project, major deliverables, assumptions, and constraints. It records the entire scope, including both the project and product scope; details the deliverables of the project; and represents the consensus reached among stakeholders regarding the project scope. To manage stakeholder expectations, the project scope statement can specify what work does not belong to this project scope. The statement allows the project team to plan in more detail, guide the team during execution, and provide a benchmark to assess whether change requests or additional work exceed project boundaries.

The level of detail in which the project scope statement describes what to do and what not to do determines the effectiveness of the project management team in controlling the entire project scope. A detailed project scope statement includes the following (which may be listed directly or referenced to other documents):

  • Product scope description: Refining features of the product, service, or result as stated in the project charter and requirement documents.
  • Deliverables: Any unique and verifiable product, result, or capability produced to complete a process, phase, or project. This includes auxiliary results such as project management reports and documents.
  • Acceptance criteria: A set of conditions that deliverables must meet before being accepted.
  • Exclusions from the project: Identifying content that is excluded from the project. Clearly stating what is not within the project scope helps manage stakeholder expectations and reduces scope creep.

Although there is some overlap in the content of the project charter and project scope statement, their level of detail is vastly different. The project charter contains high-level information, while the project scope statement provides detailed descriptions of components that will be progressively elaborated during the project.

18. Project Team Assignment Sheet

The Project Team Assignment Sheet records team members and their roles and responsibilities in the project. It can include the team directory and also requires the insertion of personnel names into other parts of the project management plan, such as the project organization chart and schedule.

19. Quality Control Measurement Results

The results of quality control measurements are written records of the outcomes of quality control activities, which should be recorded in the format determined by the quality management plan.

20. Quality Measurement Indicators

Quality measurement indicators are used to describe project or product attributes and how the quality control process will verify compliance. Examples include the percentage of tasks completed on time, cost performance measured by CPI, failure rate, identified daily defect count, total downtime per month, errors per line of code, customer satisfaction scores, and the percentage of requirements covered by the test plan (i.e., test coverage).

21. Quality Reports

Quality reports can be graphical, data, or qualitative documents. The information they contain can assist other processes and departments in taking corrective measures to achieve project quality expectations. Information in quality reports can include quality management issues reported by the team, improvement suggestions for processes, projects, and products, recommendations for corrective actions (including rework, defect/bug remedies, 100% checks, etc.), and an overview of situations discovered during the quality control process.

22. Requirement Documents

Requirement documents describe how each requirement will satisfy business needs related to the project. Initially, there may only be high-level requirements, which are then progressively elaborated as more information about the requirements becomes available. Only clear (measurable and testable), traceable, complete, consistent, and primarily stakeholder-approved requirements can serve as a baseline.

23. Requirements Traceability Matrix

The Requirements Traceability Matrix is a table that connects product requirements from their origin to the deliverables that satisfy them. By connecting each requirement to business or project objectives using the matrix, ensures that each requirement has business value. The matrix provides a way to track requirements throughout the project lifecycle, ensuring that every approved requirement in the requirement documents can be delivered by the end of the project. Lastly, the matrix offers a framework for managing product scope changes.

24. Resource Breakdown Structure

The Resource Breakdown Structure presents resources hierarchically by category and type. Resource categories include (but are not limited to) labor, materials, equipment, and supplies. Resource types include attributes relevant to the project, such as skill levels, required certifications, grade levels, etc.

25. Resource Calendar

The Resource Calendar identifies working days, shifts, regular business hours, weekends, and public holidays when each specific resource is available. Potential resource availability information (like team resources, equipment, and materials) is used to estimate resource availability during planning activities.

26. Resource Requirements

Estimating activity resources is the process of estimating the type and quantity of team resources, as well as materials, equipment, and supplies required to execute the project. The main benefit of this process is to specify the types, quantities, and characteristics of resources needed to complete the project.

Note: Due to length limitations, certain parts of the text might have been abbreviated or summarized for better readability.

27. Risk Register

The Risk Register documents detailed information about identified individual project risks. As processes such as qualitative risk analysis, risk response planning, risk response implementation, and risk monitoring are conducted, the outcomes of these processes are also recorded in the Risk Register. Depending on specific project variables (like size and complexity), the Risk Register may contain limited or extensive risk information. Upon completing the risk identification process, the Risk Register might include (but not limited to):

  • A list of identified risks. Each project risk in the Risk Register is given a unique identifier. Identified risks should be described with the necessary detail to ensure clear understanding. Structured risk descriptions can be used to distinguish the risk itself from its causes and its effects.
  • Potential risk owners. If potential risk owners were identified during the risk identification process, they should be recorded in the Risk Register. Confirmation of this will occur during the qualitative risk analysis process.
  • Potential risk response actions. If any potential risk responses were identified during the risk identification process, they should be recorded in the Risk Register. Confirmation will follow in the risk response planning process.

Depending on the format stipulated by the risk management plan, additional data about each identified risk might be recorded, such as a brief risk name, risk category, current risk status, one or multiple causes, impacts on objectives, risk triggers (indicating an impending occurrence of the risk), affected WBS components, and timing information (like when the risk was identified when it might occur, when it may no longer be relevant, and the deadline for actions).

28. Risk Report

The Risk Report provides information about the overall project risk as well as summary information about identified individual project risks. Risk reporting is progressively elaborated during the project risk management process. As processes like qualitative and quantitative risk analysis, risk response planning, risk response implementation, and risk monitoring are completed, the outcomes need to be recorded in the Risk Register. Upon completing the risk identification process, the Risk Report might contain (but not limited to):

  • Sources of overall project risk. It explains the major drivers of the project’s overall risk exposure.
  • Summary information about identified individual project risks. This might include the number of identified threats and opportunities, and the distribution of risks across risk categories, metrics, and trends.

Depending on the reporting requirements stipulated in the risk management plan, the Risk Report might contain other information.

29. Schedule Data

Schedule data in the project scheduling model is a collection of information used to describe and control the schedule. At a minimum, the schedule data includes schedule milestones, activities, activity attributes, and all identified assumptions and constraints. Other required data varies by the application area. Detailed supporting information might include (but not limited to):

  • Resource requirements over time, often displayed as resource histograms;
  • Alternative schedules such as best-case or worst-case, with or without imposed dates, with or without resource-leveling;
  • Schedule reserves. The schedule data can also encompass resource histograms, cash flow projections, and order and delivery schedules.

30. Schedule Forecast

Schedule forecasting, or schedule updates, refers to estimating or predicting the future conditions and events of the project based on available information and knowledge. As the project progresses, forecasts should be updated and republished based on work performance information. This data is based on the past performance of the project and considers expected future performance based on corrective or preventive measures. This might include Earned Value performance indices and information about schedule reserves that might impact the project in the future.

31. Stakeholder Register

The Stakeholder Register is a primary output of the stakeholder identification process. It documents information about identified stakeholders, including (but not limited to):

  • Identity information. This includes name, organizational position, location, contact details, and the role played in the project.
  • Assessment information. This covers primary requirements, expectations, potential to influence project outcomes, and the project life cycle phase most influenced or impacted by the stakeholder.
  • Stakeholder classification. Classification can be by internal or external, role, influence, power, interest, superior or subordinate, peripheral or core, or other categorization chosen by the project manager.

32. Team Charter

The Team Charter is a document that creates team values, agreements, and operating guidelines. It may include (but not limited to):

  • Team values;
  • Communication guidelines;
  • Decision-making standards and procedures;
  • Conflict resolution processes;
  • Meeting guidelines;
  • Team agreements.

The Team Charter sets clear expectations for acceptable behaviors for project team members. Recognizing and adhering to clear ground rules early on helps reduce misunderstandings and boosts productivity. By discussing areas like behavioral expectations, communication, decision-making, and meeting etiquette, team members can understand each other’s essential values. A team charter developed by or with the team works best. All project team members share the responsibility to adhere to the rules set out in the Team Charter. Regularly review and update the charter to ensure the team remains aligned with its fundamental rules and guide new members in integrating into the team.

33. Test and Evaluation Documents

Test and evaluation documents can be created based on industry needs and organizational templates. They are inputs to the quality control process used to assess the achievement of quality objectives. These documents might include specialized checklists and a detailed requirements traceability matrix.

Project Management: Skills for Success

The Best Project Management Software in 2023

If you found this guide useful, please share and leave your comments below! Your feedback helps us create better content.